Grievance
Mechanism
Skip to main content

Field Visit

Conducted a field visit on 2025/12/26 to the conservation pond site along the Dhobikhola River upstream, covering the Naulin Bhadrakali and Rudreshwor Mahadev Temple section, together with the Development Commissioner, National Project Director, District Commissioner (Lalitpur), and the National Project Manager. The visit focused on on-site observation of existing river conditions and conservation interventions, assessment of site suitability for pond development, and discussion on technical, environmental, and institutional aspects related to river conservation and ecosystem-based interventions.